ActiveInstrumentationRFP-1404-041

Distributed control system (DCS) upgrade

Migrating unit control to a new-generation DCS with redundancy and industrial cybersecurity.

Budget cap
4.7B Toman
Submission deadline
2025-08-11
Duration
24 months
Proposals received
7 proposals

Requirement overview

The unit’s current control system is more than fifteen years old and spare parts have become progressively harder to source. This call targets a phased migration to a new-generation DCS carried out without halting production.

Background and rationale

Beyond ageing hardware, the current architecture does not properly separate the control network from the office network. The client requires a secure architecture aligned with IEC 62443 alongside the hardware upgrade.

Project objectives

  • Complete the control migration without stopping production
  • Full redundancy of controllers and the communication network
  • Implement a cybersecurity architecture aligned with IEC 62443
  • Preserve the existing control logic with complete documentation

Scope of work

  • Audit the current control system and document its logic
  • Supply the new-generation DCS hardware and software
  • Phased migration during planned maintenance windows
  • Cybersecurity assessment and remediation of vulnerabilities

Expected deliverables

  • Complete documentation of the existing control logic
  • Installed DCS with verified redundancy
  • Cybersecurity assessment report and remediation plan
  • Two years of support and spare-parts supply

Applicant requirements

  • Official representation or vendor support authorisation for the DCS
  • At least two DCS migration projects in the oil industry
  • Team qualified in industrial cybersecurity
  • Able to guarantee parts availability for ten years

Evaluation criteria

  • Technical architecture and redundancy30%
  • Migration plan without production downtime30%
  • Price and ten-year cost of ownership25%
  • Cybersecurity credentials15%

Call timeline

  1. 1

    Call published

    2025-07-06

    The requirement document and the control-loop inventory were published.

  2. 2

    Control-room visit

    2025-07-24

    Technical visit to the control room and equipment rooms.

  3. 3

    Proposal deadline

    2025-08-11

    Final deadline for uploading the technical and financial proposal.

  4. 4

    Audit phase begins

    2025-09-01

    The audit of the current system starts with the selected contractor.