Live system · 24/7

Novaco Technology-Needs System

Novaco’s digital platform connecting the technology needs of Ahdaf Holding subsidiaries with knowledge-based firms, startups and research groups.

6
Active calls
+180
Proposals submitted
+60
Contracts signed
RFP-1404-082
Catalyst
Active

Recovering light olefins from FCC off-gas

TRL 4-7Jul 6, 20255.2B Toman
Smart fire monitoring for storage tanks
Tabriz Refinery
Flare-gas reduction and waste-heat recovery
Behran Oil
6 Active calls
Active calls

6 calls awaiting your solution

Technology needs currently published by the holding’s subsidiaries.

UrgentActiveRFP-1404-082Catalyst·Shazand Petrochemical

Recovering light olefins from FCC off-gas

Boosting propylene and ethylene yield from catalytic-cracking side gases with minimal disruption to main operations.

Budget cap5.2B Toman
TRL levelTRL 4-7
DeadlineJul 6, 2025
Proposals0 proposals
View details
ActiveRFP-1404-071Process safety·Tabriz Refinery

Smart fire monitoring for storage tanks

Early leak- and fire-detection for tanks using thermal sensors and image processing.

Budget cap4.0B Toman
TRL levelTRL 5-8
DeadlineJul 11, 2025
Proposals0 proposals
View details
ActiveRFP-1404-065Energy reduction·Behran Oil

Flare-gas reduction and waste-heat recovery

Fitting the unit flare with a recovery system and reusing waste heat to cut energy consumption.

Budget cap3.5B Toman
TRL levelTRL 6-9
DeadlineJul 23, 2025
Proposals0 proposals
View details
ActiveRFP-1404-058AI·Farabi Petrochemical

AI predictive maintenance for rotating equipment

Modeling vibration and temperature data to predict pump and compressor failures before they occur.

Budget cap2.8B Toman
TRL levelTRL 4-6
DeadlineAug 1, 2025
Proposals0 proposals
View details
UrgentActiveRFP-1404-049Environment·Shiraz Petrochemical

Industrial wastewater treatment and water reuse

Designing an advanced treatment system to recycle process water and reduce freshwater withdrawal.

Budget cap6.1B Toman
TRL levelTRL 5-7
DeadlineAug 6, 2025
Proposals0 proposals
View details
ActiveRFP-1404-041Instrumentation·Tabriz Refinery

Distributed control system (DCS) upgrade

Migrating unit control to a new-generation DCS with redundancy and industrial cybersecurity.

Budget cap4.7B Toman
TRL levelTRL 6-8
DeadlineAug 11, 2025
Proposals0 proposals
View details
Start Collaboration

Ready to start working with Novaco?

Our specialist team is with you — from need discovery to technology transfer and commercialization.